Projects & Achievements

ProjER1

Equipment rental

Equipment rental to various clients in Suriname and abroad

ProjEM1

Earth Moving

Hauling 900,000 WMT Ore from satellite mine Klein Saramacca to Mine Site (23 km haul road) – April 2020 till Jan 2021

Raising Tailing dams with engineered fill at TSF (Tailings Storage Facility) mine site (different stages) – 2019 until now

ProjTrans5

Transport

Transport of Heavy Fuel from Paramaribo to Mine site, ongoing with the amount of 150.000 liters daily. – 2016 until now

Transport of Diesel form Paramaribo to Mine Site – June 2014 until now – present to transport diesel fuel from Paramaribo to Mine Site with the amount of 100.000 liters daily.

Transport of different cargo and hazardous materials to several sites

CIMG1141

Closure of DRDA1 Residue Dump Area

From September 2017 to September 2019, Haukes N.V., as joint venture partner of Baitali Aanneming Maatschappij N.V., contributed to the closure of the DRDA1 residue dump area. For this large-scale project, 1,000,000 m³ of cover soil was carefully placed over a 225-hectare site, representing an important milestone in the responsible management and rehabilitation of industrial waste areas. The project required extensive planning, coordination, and execution to meet the highest standards of safety, efficiency, and environmental compliance. With this achievement, Haukes N.V. confirms its reputation as a reliable partner in sustainable, complex, and large-scale infrastructure works that demand expertise and responsibility.
CIMG0118

Closure RDA5B residue dump area.

Since August 2024, Haukes N.V. has been actively involved in the closure of the RDA5B South residue dump area, in close collaboration with its partners. For this ongoing project, 250,000 m³ of cover soil is being carefully placed over a 42-hectare site, contributing to the sustainable management, closure, and rehabilitation of industrial waste areas. The project emphasizes careful planning, continuous monitoring, and the application of safe and efficient construction methods to minimize environmental impact. By actively applying best practices and ensuring compliance with all environmental and safety regulations, Haukes N.V. demonstrates its continued commitment to sustainable development. This project further illustrates the company’s long-term role as a reliable and responsible partner in shaping safe and sustainable industrial landscapes.
CIMG0121

Closure of DRDA2 Residue Dump Area

From September 2019 to March 2022, Haukes N.V., together with Baitali Aanneming Maatschappij N.V. and Suriname Earth Moving Company N.V. (SEMC), successfully contributed to the closure of the DRDA2 residue dump area. In this important project, 835,000 m³ of cover soil was placed over a 139-hectare site, marking a significant step in the sustainable rehabilitation and responsible management of industrial wastelands. This project required careful execution, strict adherence to safety protocols, and close collaboration between all partners to ensure success. Haukes N.V.’s role highlights its expertise in large-scale infrastructure and environmental projects, where safety, efficiency, and sustainability are always prioritized. This project further strengthens the company’s reputation as a trusted partner delivering results of international quality standards.

Safe, reliable, and built on experience Haukes N.V. offers everything your project needs to succeed.

Give us a call

Get in touch with us